Petrolia men introduced the rest of the world to the
Canadian Rig. It has four poles and was easily mounted
on skids and drawn by horses to drilling sites. However,
it was so tall that early telephone lines around Petrolia
were built over 12 metres high at intersections to allow
the rigs to pass through. The Canadian Rig was easily
constructed by a crew within a few days.